A straightforward concrete base might need a budget of £100 to £180 per square metre as a typical UK guide figure, not our prices, before VAT. Small slabs can cost more per square metre because delivery, labour and equipment still need arranging. Structural requirements, difficult excavation, reinforcement and restricted access can increase the allowance substantially. Breaking Ground Ltd provides a written, itemised quotation after a site visit.
At a glance
- A concrete shed base must match the supplier footprint and support detail.
- Keep the existing UK allowances as context, not a slab specification.
- Confirm thresholds, service entries and how concrete reaches the site.
A slab for a lightweight shed is not interchangeable with a garage floor, workshop base or support for a garden building. Each has different loading, moisture and level requirements. Before comparing costs, identify the intended building, its footprint and any manufacturer requirements for bearing, dimensions and fixing positions.
This guide focuses on pricing the base itself rather than the complete building above it. Breaking Ground Ltd installs concrete bases and slabs around Colchester, Essex, and within about 30 miles across Essex and south Suffolk. Matt Nash explains the decisions that make an allowance realistic, without treating a square metre rate as a finished specification.
Budget allowances: typical UK guide figures, not our prices
| Item | Typical UK guide figure | What moves it |
|---|---|---|
| Prepared, accessible domestic base | £100 to £180/m², typical UK guide figure, not our prices | Slab specification, area and excavation |
| More demanding reinforced base | £150 to £250/m², typical UK guide figure, not our prices | Loading, reinforcement and ground conditions |
| Concrete pump allowance | £350 to £700 per attendance, typical UK guide figure, not our prices | Reach, hire period and delivery coordination |
Typical UK guide figures before VAT, not our prices. Allowances are not a quotation; confirm inclusions, exclusions and applicable VAT after a site visit.
What should the base price actually include?
An installation allowance should describe setting out, excavation, disposal, formation preparation, compacted sub-base, formwork, concrete supply, placing and finishing. Where the design requires membranes, insulation or reinforcement, these need their own specification. Otherwise two totals may appear comparable while one leaves essential work for someone else to arrange.
Ask whether delivery charges, equipment hire, waste removal and final clearing are included. A ready-mix delivery does not automatically include a pump or the labour needed to move concrete through a narrow passage. Concrete volume is calculated from area and thickness, but the ordered quantity also needs sensible allowance for practical site conditions.
For example, a 20 square metre footprint at 100 mm thickness contains two cubic metres geometrically. That calculation is not advice to use that thickness. A supplier or designer must establish the correct construction for the proposed use, and the quotation should follow that requirement rather than reverse-engineering a slab to meet a low budget.
Why thickness, loading and ground change the budget
A slab supporting storage shelves, machinery or vehicle wheels can need a different design from one carrying a small timber shed. Concentrated loads at posts or walls also matter. Thickening an edge, increasing reinforcement or changing the concrete specification affects materials, excavation and handling, not just the volume of concrete purchased.
Soft spots, made ground, roots and buried obstructions can make the excavated formation unsuitable. Simply pouring thicker concrete over weak material is not a reliable solution. Allow for investigation or design advice where conditions are uncertain, particularly if the slab forms part of a structure or carries significant loads.
Membranes and insulation should suit the building use and design. A habitable garden building has different performance requirements from an unheated equipment store. Check how the base meets any building supplier details, drainage arrangements and relevant Building Regulations requirements before ordering materials, so that moisture protection and finished levels work together.
Access and small pours can outweigh the area rate
A compact base at the far end of a garden can be disproportionately expensive. Excavated material has to come out and sub-base, reinforcement and wet concrete have to go in. Passage width, steps, overhead restrictions and the distance from a delivery vehicle determine which machines and handling methods are practical.
Concrete pumping may solve a placement problem, but it requires suitable setup space, safe access and somewhere appropriate to manage washout. Delivery timing and labour need coordinating because concrete cannot wait indefinitely. Confirm who books each element and whether waiting time or an unsuccessful delivery would create extra charges.
For a smaller slab, mobilisation and minimum delivery charges are spread over fewer square metres. Increasing the footprint slightly may therefore cost less than the original average rate suggests, although it still needs checking against boundaries, drainage and intended use. Compare total scope costs, not a headline rate lifted from a larger project.
Plan levels, finish and curing before agreeing scope
The finished height needs to suit doors, thresholds, surrounding paving and drainage. Water should not be directed towards a building or trapped against timber cladding. Agree these relationships before excavation, especially where a replacement base sits between existing structures and there is little flexibility to change surrounding levels.
A smooth finish, a textured external finish and a floor intended to receive another covering are different requirements. State whether the slab will remain exposed and what tolerances the building supplier needs. Anchor positions and service penetrations should be planned in advance rather than drilled or cut without checking reinforcement and services.
Curing and protection are part of the programme. Concrete gaining early strength is not the same as being ready for every intended load. Weather, mix and design requirements influence the waiting period. Get project-specific guidance before erecting the building, driving onto the slab or applying a coating, rather than relying on a universal number of days.
Get a quotation that matches the building
Supply a dimensioned plan, photographs of access, the intended use and any drawings from the building manufacturer. Include information about existing hardstanding, possible buried services and where spoil can be loaded. If a structural design is needed, establish who commissions it and whether its fee is separate from the installation.
Breaking Ground Ltd assesses the site before issuing a written breakdown. Ask for the proposed build-up, concrete specification, waste arrangements and exclusions to be recorded. If unsuitable ground is uncovered, agree how additional excavation or a revised design will be approved and priced before work continues.
Concrete shed base: choose the footprint before the price
A shed base is not specified simply by drawing a rectangle slightly bigger than the building. Obtain the supplier detail showing bearing points, frame dimensions, fixing requirements and the relationship between concrete and cladding. An exposed ledge can hold water against the building, while an undersized slab can leave the supporting frame outside the intended footprint.
State what the shed will hold. Concentrated storage or equipment can affect the design, even if the building itself appears lightweight. The concrete specification, ground preparation and any reinforcement should follow the actual use. Do not turn the broad allowances above into a recommended thickness or a promise that every shed can use the same base.
Reconcile the shed detail with the surrounding garden
A level support surface and a sensible surrounding drainage layout must work together. Agree how paths reach the entrance without leaving a lip or sending runoff towards timber. Existing garden levels may need adjustment outside the base rather than changing the supplier detail to fit them.
See concrete bases and slabs for the offered work and garden room bases where a more substantial building is proposed. Breaking Ground focuses on substantial packages rather than isolated handyman work. Send the proposed use and access so project suitability can be discussed before assuming a small shed-base booking.
When to call a professional
Bring in a contractor before ordering a building if access is tight, ground levels are awkward or the base has structural duties. Early coordination can prevent a delivered building arriving before its foundations are suitable. Seek an engineer where loading or ground conditions need a designed solution.
- Confirm the exact footprint and intended loads.
- Identify service routes before excavation starts.
- Share manufacturer details and threshold heights.
Need it sorted? Book Discuss a concrete base
Services this relates to
Want the figure for your own property? Call 07770 880587 or email enquiries@breakinggroundltd.co.uk and we will arrange a site visit.