Breaking Ground LtdCall
Foundation trench excavated alongside an existing house ready for a concrete pour

Extension Foundations

Strip foundations and trench fill for house extensions

Strip and trench fill foundations for house extensions, dug and poured to the engineer's design and building control's inspection.

The approach

The part of your extension nobody sees decides whether the walls above stay straight.

Most house extensions in Essex and Suffolk sit on either strip foundations or trench fill foundations. Both are continuous concrete bases running under the new walls. The choice depends on the ground, the depth needed and how quickly the walls must come up to ground level, and it should be set by the engineer's or designer's drawings rather than chosen on site.

This page is about the foundation stage of an extension. Our foundations and groundworks hub covers the wider package, from clearance to the floor slab, while the extension foundations cost guide explains what changes the price.

Strip foundations versus trench fill

A strip foundation is a band of concrete at the bottom of the trench, with blockwork or brickwork built up from it to ground level. It uses less concrete and can suit shallower, stable ground.

Trench fill fills most of the trench with concrete, leaving only a short distance to build up. It is often preferred on clay or deeper digs because it avoids bricklaying in a deep, narrow trench and lets the job reach ground level faster. It uses more concrete, so the balance between materials and labour changes with depth.

Depth, clay and trees

House foundations are not dug to a single universal depth. Shrinkable clay, which covers much of Essex, moves as it wets and dries, so foundations must reach below the zone affected by that movement. Nearby trees can push the required depth much further. Our guide to how deep foundations should be explains why, and building on clay soil in Essex covers heave precautions.

Joining the extension to the house

An extension foundation runs alongside the existing house, so we expose and record the old footing where needed and follow the designer's detail for the junction. Drains that cross the footprint are located early, bridged with lintels or rerouted, and protected from settlement. Where digging near a neighbour's building triggers the Party Wall Act, the notices should be dealt with before we start.

Inspection before the pour

Building control, or the approved inspector, inspects the open trenches before concrete is placed. They confirm the depth and bearing ground, and can ask for the trench to go deeper if the soil is not what was expected. We programme the concrete around that visit so the pour follows promptly and the trench bottom does not soften in the rain.

What affects the cost

Extension foundation costs depend on depth, ground conditions, trees, the volume of concrete, spoil removal, drains in the way and access around the house. Guide figures only, because levels, access and drainage decide the final price. Every quotation we issue is fixed and itemised.

Set out

Footprint and trench lines marked from the drawings, checked against the existing house and boundaries.

Excavate

Trenches dug to the specified width and depth, with spoil managed and the sides kept safe.

Inspect and pour

Building control inspection, then concrete placed, levelled and protected while it cures.

Up to DPC

Blockwork built to damp-proof course level, ready for the floor and the walls above.

Who this suits

Homeowners with approved plans for a single or double storey extension who want the foundation stage handled carefully and recorded properly.

  • Strip or trench fill
  • Building control inspections
  • Tied to the existing house

Read before you commit

Covering 30 miles of Colchester, including Colchester, Chelmsford, Ipswich, Braintree, Witham, Maldon, Sudbury, Clacton-on-Sea and Halstead.

Request a consultation

We take on new build contracts and substantial driveway and garden projects. Give us the detail and Matt will come back to you personally.

By sending this form you agree to our privacy policy.

Prefer to talk? Call 07770 880587 or email enquiries@breakinggroundltd.co.uk.

Questions we are asked

Extension Foundations: your questions

Which is better for an extension, strip or trench fill foundations?+

Neither is better in every case. Trench fill is common on clay and deeper digs; strip foundations can use less concrete in shallower ground. The engineer or designer specifies which.

What happens if building control asks us to dig deeper?+

We continue to the depth they require, record it and adjust the concrete quantity. That is why depth variations are set out clearly in our itemised quote.

Can the extension foundation go over an existing drain?+

Drains in the footprint are usually bridged, sleeved or rerouted to the designer's detail and building control's approval, so the new foundation does not bear onto the pipe.

How long is the foundation stage of an extension?+

It depends on size, depth and inspection timing. The concrete must cure before blockwork loads it, so we plan the dig, inspection and pour as one short sequence.

Breaking Ground. Building Trust.

Discuss extension foundations for your property

Send the approved extension drawings and mention any trees, drains or neighbouring walls close to the footprint.

Ten year guarantee on extensions and new builds / 30 miles of Colchester / Substantial projects