Percolation test and soakaway regulations in plain English

Written by Matt Nash, Breaking Ground Ltd

Last updated:

What happens in a percolation test, how the result sizes a soakaway, and the regulations building control will look at.

A percolation test measures how quickly water drains into the ground at a particular spot. It is the starting point for any soakaway, because a soakaway that is too small for slow ground will overflow, and one built where the ground does not drain at all will simply become an underground pond.

This guide explains the test, the design method usually referred to as BRE 365, and the parts of Building Regulations Part H that affect where rainwater may go. It is general information to help you understand the process. Building control, and where needed a drainage engineer, decide what is acceptable for your property.

Why the test matters

Two gardens on the same road can drain very differently. A pocket of sand, a band of clay, an old filled pond or compacted ground from a previous build all change the result. Building control will usually want evidence that a proposed soakaway sits in ground that accepts water, rather than an assumption based on the local geology map.

The test also protects the house. A soakaway that fails pushes water back up the pipe, and that water tends to appear near the downpipes and walls it was meant to protect.

How a soakaway percolation test is carried out

A trial pit is dug at the location and depth the soakaway would occupy. It is filled with water, and the time taken for the level to fall between set points is recorded. The BRE 365 method times the fall from 75 per cent to 25 per cent of the effective depth, and repeats the test so the ground is properly wetted. The slowest result is normally used for design, because that represents the ground at its worst.

Testing is best done when the ground is reasonably wet. A test in a dry summer can flatter clay that will behave very differently in winter.

  • Dig the pit where and as deep as the soakaway will be
  • Fill with water and time the fall between marked levels
  • Repeat so the soil is saturated
  • Use the slowest result to calculate the infiltration rate

From result to soakaway size

The measured rate is converted into a soil infiltration rate. The designer then works out how much rain the roof or paving will collect in a design storm and how much storage the soakaway must hold while that water drains away. Slow ground needs a larger volume; fast ground a smaller one. Crates store more water than a rubble fill of the same size, which is why they are common in smaller gardens.

What Building Regulations Part H says

Approved Document H sets a preferred order for rainwater: first an adequate soakaway or other infiltration system, then a watercourse, and only if neither is reasonably practicable, a sewer. That is why a sewer connection is usually the last option discussed, not the first.

The guidance also says soakaways should normally be at least 5 metres from a building, and should not be placed where water would flow towards foundations. It is not suitable to build one in ground where the water table reaches the base, or near land that may be contaminated.

When the result is poor

If the ground barely drains, the options include a larger or shallower infiltration area, permeable paving that spreads water over a wider base, or attenuation: a sealed tank that stores water and releases it slowly to a watercourse or sewer under an agreed rate. Each needs building control's acceptance and, for a sewer, the water company's consent.

Who does what

A groundworks contractor can dig the trial pit, run the test and build the soakaway. On larger roofs, new houses and difficult sites, a drainage engineer typically carries out the calculations and drawings. Keep the test records, because building control may ask to see them.

Need it sorted? Book a soakaway installation

Services this relates to

Want the figure for your own property? Call 07770 880587 or email enquiries@breakinggroundltd.co.uk and we will arrange a site visit.

Request a consultation

We take on new build contracts and substantial driveway and garden projects. Give us the detail and Matt will come back to you personally.

By sending this form you agree to our privacy policy.

Prefer to talk? Call 07770 880587 or email enquiries@breakinggroundltd.co.uk.

Questions we are asked

Frequently asked questions

How long does a percolation test take?+

The digging is quick, but the test itself is repeated until the ground is saturated, so allow most of a day. Very slow ground can take longer.

Is a percolation test the same for a septic tank drainage field?+

No. Drainage fields for treated wastewater use a different test method set out in Approved Document H. This guide covers rainwater soakaways.

Can I do the test myself?+

Some homeowners do, but building control may expect it to be done or checked by the contractor or engineer designing the soakaway, at the right depth and location.

What if the test fails in winter but passed in summer?+

Design for the worse result. A soakaway sized on summer figures is likely to struggle in the wet months when it is needed most.

Breaking Ground. Building Trust.

Need it sorted? Book a soakaway installation

Tell us the roof or paved area to drain and where you think the soakaway could go. We will visit, survey and quote properly.

Ten year guarantee on extensions and new builds / 30 miles of Colchester / Substantial projects