Soakaway cost depends on infiltration testing, contributing area, storage design, ground conditions, access, excavation and reinstatement. Establish whether infiltration is viable before budgeting for a pit or crates. Replacing a failed soakaway also requires finding the reason for failure.
At a glance
- Test ground suitability before settling the storage design.
- Include connecting pipes, silt management and reinstatement.
- Investigate upstream blockages before assuming replacement.
A soakaway is mostly hidden, so it is easy to underestimate what goes into one. The size of the hole, how deep it goes, what fills it and what must be put back on top all depend on your ground and the area being drained, which is why a standard price is rarely meaningful.
This guide sets out the cost drivers for new soakaways and replacements. We do not publish figures for this work; each soakaway is priced from a site visit with a fixed, itemised quote.
Testing and design
Building control usually expects a soakaway to be sized from a percolation test, which means digging a trial pit, filling it with water and timing how quickly it drains, often more than once. That test sets the size of everything that follows. Our percolation test and soakaway regulations guide explains the method.
Larger roofs or poor results may need a drainage engineer's calculations, which adds a design fee but avoids building something too small.
The area being drained
The more roof or hard surface sending water to the soakaway, the more storage it needs. An extension roof is very different from a full house roof plus a large non-permeable driveway. Bigger catchments mean bigger excavations, more crates or fill, and more spoil to remove.
Ground conditions
Fast-draining sand or gravel needs a smaller soakaway than slow clay. Where the ground hardly drains, a soakaway may not be viable at all, and an attenuation tank with a controlled outflow could be needed instead, which changes the cost picture. High groundwater, buried services and tree roots also affect where and how deep you can dig.
Crates, rubble and materials
Plastic crates store more water in a smaller hole and are easier to inspect. A traditional rubble-filled pit uses cheaper fill but needs a bigger excavation for the same volume. Crates under a driveway must be rated for vehicle loads. Geotextile wrap, a silt trap or catchpit, and the pipework from downpipes all add to the total.
Under a drive or patio, the surface above must also be rebuilt, which can cost more than the soakaway itself.
- Crate units and geotextile
- Silt trap or catchpit
- Pipe runs from downpipes or gullies
- Backfill and surface reinstatement
Access and spoil
A mini digger through a wide side gate is far quicker than digging by hand. Every cubic metre dug out has to go somewhere, and taking spoil away by lorry or skip is often one of the largest lines on the quote.
What affects soakaway replacement cost
Replacing a soakaway usually involves digging out the old one first. Old rubble pits clogged with silt are heavy, wet work. It is also important to find out why the old soakaway failed. If it was undersized, a like-for-like replacement will fail again. If the ground has stopped accepting water, a different solution may be needed.
Sometimes the problem is upstream, such as a blocked pipe or missing silt trap, and a camera survey of the drain can avoid replacing a soakaway that is still sound.
Ask for the drainage scope behind the price
The soakaway installation service links testing and construction. Read percolation testing before assuming an advertised crate volume fits the site, and send the catchment details for a project assessment. Separate trial work, design and reinstatement when comparing proposals.