Clearance is the stage most people budget last and it frequently costs more than the figure in their head, because the cost is not the knocking down. It is the taking away, and the surveys and notices that legally come first.
The factors below explain what changes a demolition and clearance quote, alongside the checks required before work starts.
Demolition and clearance cost factors
| Cost factor | What changes | Why it matters |
|---|---|---|
| Structure and base | Size and construction | Materials, base thickness and the demolition method determine the scope. |
| Surveys and hazardous materials | Findings and specialist work | Asbestos findings and required specialist removal affect the programme and quote. |
| Muck away | Volume and waste type | Disposal depends on the amount and classification of material leaving site. |
| Access and protection | Site constraints | Machine access, fencing, dust control and retained surfaces affect labour. |
| Plot handover | Required level | The agreed finished level and any crushing or reuse are included in the scope. |
We price every job from a site visit with a fixed, itemised quote.
What has to happen before demolition
- An asbestos refurbishment and demolition survey on anything pre 2000
- A section 80 demolition notice to the local authority for larger structures
- Disconnection of gas, electricity, water and drainage by the relevant authority
- A written method statement and risk assessment for the sequence of work
- Bat and nesting bird checks on older outbuildings at the wrong time of year
Muck away is most of the cost
Demolition creates volume, and volume is charged by the lorry load at the tip. Segregating material properly, and crushing suitable concrete and brick on site for reuse as sub base, is the single largest saving available on a clearance budget.
It is also better practice. Material that stays on site is material that never sat in a lorry queue on the A12.
Finishing at a known level
Clearance is not finished when the structure has gone. We finish at a measured, recorded level so the groundworks that follow can be set out from something reliable, rather than starting with a surprise about how much fill is needed.
Protecting the property you are keeping
- Heras fencing and clear separation from the occupied house
- Boarded access routes and wheel washing to keep the road clean
- Dust suppression, and neighbours told the programme in advance
- Trees and boundaries protected before plant arrives