New build groundworks, stage by stage

Written by Matt Nash, Breaking Ground Ltd

Last updated:

What happens between a cleared plot and a platform ready for the bricklayers, and who inspects what.

Self builders and homeowners commissioning a new build are usually confident about the parts they can picture and vague about the eight weeks before anything appears above ground. That period sets the accuracy, the drainage and the structural integrity of everything that follows.

This guide explains a typical residential plot sequence and the points at which required inspections may be scheduled.

Stage one: setting out

Profiles and laser levels are used to set the building out against the boundaries, the datum and the approved drawings. Errors here are compounded by every trade that follows, so it is worth the day it takes.

Stage two: foundation excavation

Trenches are dug to the design depth, sides inspected, and any variation in ground conditions reported to the engineer rather than covered over. Building control attends before concrete goes in.

Stage three: concrete and reinforcement

Reinforcement is fixed to specification with correct cover, pours are booked around the weather, and volumes poured are recorded. On clay sites near trees this stage carries the bulk of the foundation cost.

Stage four: drainage and services

Foul and surface water runs are laid at correct falls with inspection chambers positioned to be accessible rather than tidy. Soakaways and attenuation are installed at design distance from the building, and ducting for power, water and data goes in before anything is covered.

Drainage is inspected and air tested before backfill.

Stage five: oversite and floor structure

Blockwork to damp course, hardcore and sand blinding, membranes and insulation, then either a beam and block floor or a power floated slab. This is the final inspection before the superstructure starts.

Stage six: handover to the build

The groundworks stage should end with a level, accurate and drained platform, plus the records required for the next stage. Extensions and new builds come with a 10-year guarantee.

Services this relates to

Want the figure for your own property? Call 07770 880587 or email enquiries@breakinggroundltd.co.uk and we will arrange a site visit.

Request a consultation

We take on new build contracts and substantial driveway and garden projects. Give us the detail and Matt will come back to you personally.

By sending this form you agree to our privacy policy.

Prefer to talk? Call 07770 880587 or email enquiries@breakinggroundltd.co.uk.

Questions we are asked

Frequently asked questions

How long do new build groundworks take?+

The programme depends on foundation design, ground conditions, drainage, access and weather. The stages should be agreed for the specific plot.

How many building control inspections are there?+

The required checks depend on the project and appointed building control body. Typical stages can include excavation, reinforcement, drainage and oversite.

Can you do groundworks only and leave the rest to my builder?+

Yes. Groundworks packages for self builders and main contractors are regular work for us, priced in clear stages against the engineer's drawings with a defined handover point.

What happens if ground conditions differ from the survey?+

Work stops on that element, the engineer and building control are informed, and a revised detail is agreed before we continue. Any cost change is presented in writing before it is incurred, not added at the end.

Do you handle the plot clearance as well?+

Usually, yes. Clearance and groundworks under one contract means one set of plant on site, spoil handled once, and a measured level between the two stages instead of a dispute.

Breaking Ground. Building Trust.

Ready for a real figure rather than a range?

Tell us about the plot, the property and what you want the finished result to be. We will visit, survey and quote properly.

Ten year guarantee on extensions and new builds / 30 miles of Colchester / Substantial projects