Self Build Groundworks
Self build groundworks for people building their own home
Groundworks for people building their own home: clearance, foundations, drainage and services in the order your frame or kit supplier needs.
The approach
On a self build, the groundworker sets the date every other trade depends on.
When you are managing your own build, the groundworks are usually the first big package you let and the one most likely to throw the programme out if it goes wrong. The frame or kit supplier needs a level, accurate base on a fixed date. Building control needs to see the trenches before concrete goes in. The drainage has to match the approved layout. Getting these in the right order is what this service is about.
We take on the below-ground stages of a self build so you deal with one contractor for the plot rather than several. For the general order of works on any new house, see new build groundworks. If you are still planning, our self build groundworks checklist lists what to have in place before you ask for prices.
What we need from you before starting
A self builder holds information a developer would normally gather in-house. We will ask for the approved planning drawings, the structural engineer's foundation design, any site investigation or soil report, the drainage layout and the frame or kit supplier's base tolerances. If trees are near the footprint, the arboricultural report matters too, as it can change foundation depth.
We can work with your engineer, or advise you on appointing one. Where details are missing, we would rather raise them at the quoting stage than discover them with a machine in the trench.
Working around your frame or kit supplier
Timber frame, SIPs and oak frame suppliers each set their own tolerances for the base. Some want a concrete slab, others a beam and block floor or a ring beam, and most expect it level within a few millimetres. We agree the target with you early so the base we hand over is the one the erection crew expects.
Delivery dates for frames are often fixed weeks ahead. We build the groundworks programme back from that date, allowing time for inspections, concrete curing and any wet weather, so you are not paying for a crane that has nothing to stand on.
Keeping costs visible
Self builders tend to watch every line of the budget. Our quotes separate clearance, excavation, foundations, drainage, services and floor so you can see where the money goes and compare like with like. Our guide to new build cost per m2 explains why a single square metre figure can mislead.
What affects the cost
Self build groundworks costs depend on the soil, foundation design, plot access, drainage distances, service connections and how much spoil leaves site. Guide figures only, because levels, access and drainage decide the final price. Every quotation we issue is fixed and itemised.
Plot preparation
Clearance, topsoil strip, access and a hardstanding for deliveries, set out from your drawings.
Foundations
Trenches dug to the engineer's depth, inspected by building control, then concreted.
Drainage and ducts
Foul and surface water runs, soakaways where approved, and ducts for incoming services.
Floor and handover
Substructure brought up to damp proof course and the slab or floor ready for the frame.
Who this suits
People building a one-off home on their own plot who want a single contractor to deliver the below-ground work in step with their frame supplier and inspections.
- Built to your engineer's drawings
- Inspections planned into the programme
- Ready for the frame delivery date
Read before you commit
- New build groundworks, stage by stage
The general order of below-ground work on any new house.
- Self-build groundworks checklist before excavation
Paperwork and decisions to settle before the plot is priced.
- New build cost per m2: why the figure varies
Why plot conditions move the budget more than floor area alone.
- Self-build groundworks cost: budgeting the part below ground
Ranges, VAT relief and CIL exemption explained.
- How to compare groundworks quotes for a larger project
Putting plot to slab tenders side by side.
- What should you check before buying a building plot?
Investigate the permissions, rights and physical constraints that decide whether a plot can support your intended home.
Covering 30 miles of Colchester, including Colchester, Chelmsford, Ipswich, Braintree, Witham, Maldon, Sudbury, Clacton-on-Sea and Halstead.
Request a consultation
We take on new build contracts and substantial driveway and garden projects. Give us the detail and Matt will come back to you personally.
Questions we are asked
Self Build Groundworks: your questions
What groundworks does a self build need before the frame goes up?+
Usually site clearance, setting out, foundations, below-ground drainage, service ducts and the substructure up to damp proof course, finished with the slab or floor the frame sits on. The exact list follows your approved drawings and the frame supplier's requirements.
Can you work to my engineer's drawings and building control inspections?+
Yes. We build to the engineer's foundation design and the approved drainage layout, and we plan stages so building control can inspect trenches and drains before they are covered.
Should I sort the groundworks before ordering my frame?+
Speak to both early. The frame supplier's base details affect how the groundworks are built, and the groundworks programme decides when the frame can be delivered.
Do you handle the utility connections?+
We dig trenches and lay ducts for water, power and data. The utility companies or their approved contractors make the final connections to their networks.
Breaking Ground. Building Trust.
Discuss self build groundworks for your property
Send your approved drawings, the engineer's foundation design and your frame delivery date.
Ten year guarantee on extensions and new builds / 30 miles of Colchester / Substantial projects